Free tool

Construction Invoice Template

A free construction invoice with labor and materials lines ready to edit. Bill in stages, show retainage, and download a clean PDF or print a blank template.

Loading the invoice generator…
Construction invoice in short
On this page

How to make a construction invoice

1

Add your company details

Enter the company name, address, license and tax number, and upload your logo.

2

Add the client and project

Put the client or general contractor as the bill-to party, and use the reference field for the project name, job number or PO.

3

Bill the work

For a small job, list labor, materials and equipment. For a large one, bill the share of the contract completed this period, and add retainage as a negative line.

4

Check the balance and send

Enter any payment already received, check the balance due and download the PDF. Every invoice is numbered and saved in My documents.

Progress billing and retainage

On longer construction projects you rarely wait until the end to get paid. Instead you send progress invoices, each one for the share of the work finished since the last bill. Many contracts also allow the client to hold back a percentage of each payment, called retainage, until the project is complete. Retainage is often between 5% and 10%, but the rate is whatever your contract says.

Progress invoice formula

Work completed = contract value × percent complete this period

Retainage = work completed × retainage rate

Amount due = work completed − retainage

Bill the retainage you held back on a final invoice once the project is accepted.

Example: progress invoice with 10% retainage

A builder has a $48,000 contract and finished 40% of the work this month. The contract allows 10% retainage.

  • Progress billing (40% of $48,000) $19,200.00
  • Retainage held (10%) −$1,920.00
  • Amount due this period $17,280.00

In the form, add retainage as a line with a negative rate, for example −1920, so it shows clearly on the invoice.

What to include on a construction invoice

Keep paperwork matched to your contract

Large projects often require a specific pay application format. Use this invoice for smaller jobs and subcontract work, and follow your contract’s billing rules where they ask for a particular form.

For smaller residential jobs, the contractor invoice template is a simpler starting point, and the estimate generator helps you price work before it begins.

Sample construction invoice line items

Construction invoices often cover more than labor and materials. These are the lines you will use most on progress invoices:

Line itemHow to bill itTip
Progress billingContract value × percent complete this periodBill against your schedule of values, item by item.
Approved change ordersThe agreed price of each changeNumber each change order and bill only signed ones.
Stored materialsMaterials delivered to site but not yet installedOnly if your contract allows it. Keep delivery tickets.
General conditionsSupervision, temporary facilities and site costsMany contracts bill these monthly or as a percentage.
Subcontractor costsAmounts billed by your subs this periodCollect their lien waivers before you pay them.
Retainage heldA negative line, such as 10% of work completedBill the retainage separately once the project is accepted.
Previous paymentsPayments already received on the contractEnter them in Amount already paid.

Use a schedule of values for progress billing

A schedule of values breaks the contract price into parts, such as site work, foundations, framing, roofing and finishes, each with its own dollar value. On every progress invoice you show how far each part has come, and the amount due follows from those percentages. Clients and lenders can check your claim quickly, and disputes about how much work is done become much rarer.

On larger commercial projects, the client or lender may ask for a standard pay application format, such as the AIA G702 and G703 forms. Use those when the contract requires them. For residential and smaller subcontract jobs, a clear itemized invoice like the one above is usually enough.

Lien waivers and getting paid

Owners and general contractors often ask for a lien waiver with each payment. A conditional waiver gives up lien rights only once the payment actually clears, while an unconditional waiver gives them up right away. Some states, including California and Texas, require specific statutory waiver forms. Never sign an unconditional waiver for money you have not yet received.

Common construction invoicing mistakes

How retainage builds up over a project

Retainage is held back from every progress payment, so it grows as the project goes on. On a $48,000 contract with 10% retainage, the client keeps 10% of each amount you bill. By the time you have billed the full contract, $4,800 has been held back.

Billing periodWork billedRetainage held (10%)Paid to you
Month 1 (40% complete)$19,200.00$1,920.00$17,280.00
Month 2 (75% complete)$16,800.00$1,680.00$15,120.00
Month 3 (100% complete)$12,000.00$1,200.00$10,800.00
Total$48,000.00$4,800.00$43,200.00

The $4,800 is then billed on a final retainage invoice once the work is accepted, often after a final inspection and a punch list is completed. Some contracts reduce the retainage rate halfway through a project, and some states cap retainage on public or private work, so read your contract and local rules. Track the running total on every invoice so nothing is forgotten at the end.

The final invoice and project closeout

The last invoice on a construction job usually covers the remaining work, any final change orders and the release of retainage. Before you send it, walk the punch list with the client, collect the final inspection or certificate of occupancy if one is needed, and gather what the contract asks for at closeout, such as warranties, manuals and final lien waivers from your subcontractors and suppliers.

On the invoice itself, show the full contract value, all approved change orders, total billed to date, total paid and the retainage now due. A clear summary at the end of the project makes it easy for the client or lender to approve the last payment quickly.

Construction invoice FAQ

Yes. Use it online or download a blank copy as often as you need, with no sign-up and no watermark.

Add a line such as “Retainage held (10%)” with a negative rate. The amount is taken off the subtotal and shows on the invoice.

Add each approved change order on its own line with its number and description, so the client can match it to the signed change.

Yes. Add a line like “Progress billing, 40% of contract” with the dollar amount for that share of the work.

Yes. Turn on Blank template above the preview and download an empty invoice to fill in by hand.

Only in your browser on this device. Use Backup or Export CSV in My documents to keep copies for your accountant.

Scroll to Top