Free tool

Work Schedule Maker

Plan a week of shifts for your team, catch overtime and short rest before it happens, and print a clean schedule to post.

Loading the work schedule maker…
Work schedule maker in short
On this page

How to use the work schedule maker

1

Add your team

Enter each person’s name, role, hourly rate and the most hours they should work in a week. Tap the day letters to mark days they are unavailable.

2

Set up roles and shift templates

Roles get a color so you can read the board at a glance. Templates such as Open, Close or Lunch fill in start, end and break times with one click.

3

Place the shifts

Click an empty cell to add a shift, or pick extra days to repeat it across the week. Drag a shift to move it, or hold Ctrl or Alt while dragging to copy it. Unassigned work goes in the Open shifts row.

4

Fix warnings, then publish

Check the warning count, the daily hours and the coverage bars. When it looks right, download a PDF to post or share, or export a CSV for payroll.

What the schedule maker checks for you

A schedule that looks fine on paper can still break labor rules or burn people out. Every time you change a shift, the tool rechecks the whole week and marks problem shifts with an orange outline and a warning sign. Hover over a shift or open the warnings list to see exactly what is wrong.

Overtime

Hours above your weekly overtime limit (40 by default) are counted separately and priced at time and a half in the cost estimate.

Double booking

Two shifts for the same person that overlap in time are both flagged, even when one runs past midnight.

Short rest

If the gap between one day's shift and the next is shorter than your minimum rest setting, the second shift is flagged. This catches the classic close-then-open problem.

Availability and limits

Shifts on a day someone marked as unavailable are flagged, and so is anyone scheduled over their personal maximum hours.

How hours and labor cost are calculated

Paid hours for one shift

Paid hours = (end time − start time − unpaid break) ÷ 60

A shift that ends earlier than it starts, such as 10 PM to 6 AM, is treated as an overnight shift and ends the next day.

Breaks are entered in minutes and are always treated as unpaid.

Estimated weekly cost for one employee

Regular hours = the smaller of weekly hours and the overtime limit

Overtime hours = weekly hours − overtime limit (if above zero)

Cost = regular hours × rate + overtime hours × rate × 1.5

The total is a planning estimate. It leaves out payroll taxes, benefits, tips and state daily overtime rules.

The coverage line under each day counts how many people are working during each hour, so you can spot a thin lunch rush or an empty closing hour without reading every shift. The By day view turns the same data into a timeline with a larger coverage chart.

Worked examples

A restaurant week

The sample schedule is a small restaurant with six people and 28 shifts, one of them still open on Sunday dinner.

  • Scheduled hours 173
  • Estimated labor cost $3,472.75
  • Open shifts 1
  • Warnings 4

The four warnings are real problems you would want to catch before posting: one server is over 40 hours, he is also over his own 40-hour limit, and two cooks close at 11 PM and open again at 7 AM.

Pricing overtime

Tom works lunch shifts all week plus three dinners and a Sunday double. His rate is $15 an hour and the overtime limit is 40 hours.

  • Weekly hours 43.5
  • Regular pay 40 × $15 = $600.00
  • Overtime pay 3.5 × $22.50 = $78.75
  • Estimated cost $678.75

Moving one 6-hour dinner shift to the open server slot removes the overtime and the warning, and the board updates as soon as you drop the shift.

Close then open

A cook works Thursday from 3 PM to 11 PM and is scheduled again on Friday at 7 AM. The minimum rest setting is 10 hours.

  • Thursday shift ends 11:00 PM
  • Friday shift starts 7:00 AM
  • Rest between shifts 8 hours
  • Result Friday shift flagged

Set the minimum rest to whatever your state, union contract or company policy requires. Set it to 0 to turn the check off.

Printing and sharing the schedule

Click Download PDF and pick one of three layouts. The team schedule puts everyone on one landscape page with role colors, daily hours and a posted date, ready for the break room wall. The per-employee layout prints a small card for each person with only their own shifts, which is handy for texting a photo or handing out. The blank schedule prints your team’s names with empty days so you can fill it in by hand.

The CSV export lists every shift with date, person, role, start, end, break and paid hours, followed by a summary of hours, overtime and cost per person. It opens in Excel and Google Sheets, so you can pass it to payroll or keep a record. To compare scheduled hours with what people actually worked, use the time card calculator or a timesheet template.

Tips for a better weekly schedule

Start from last week

Copy last week brings every shift forward seven days, so you only need to adjust for time-off requests and busy days.

Post open shifts

Put uncovered work in the Open shifts row instead of leaving a gap. It stays visible on the board and on the printed schedule.

Watch the coverage line

The bars under each day show quiet and busy hours. Shift a start time by an hour to cover a rush without adding a whole shift.

Keep schedules separate

Save one schedule per location or department under My schedules, and download a backup file now and then.

Your data stays on your device

There is no sign-up. Your team, rates and shifts are saved only in this browser’s local storage, so they are not sent to us or anyone else. Clearing your browser data removes them, which is why the Backup (.json) button exists. Restore the file on another computer to continue there.

Work schedule maker FAQ

Yes. It is free with no account, no trial and no limit on employees or schedules. Printed and PDF schedules carry no watermark or branding.

Yes. Use the arrows next to the date range to move between weeks. Each week keeps its own shifts, and Copy last week brings the previous week’s shifts forward so you can edit them.

Enter the end time as it appears on the clock, for example 10:00 PM to 6:00 AM. The tool sees that the end is earlier than the start and counts the shift as ending the next morning.

No. It multiplies scheduled hours by each person’s hourly rate and adds time and a half above your weekly overtime limit. Employer taxes, benefits, tips and daily overtime rules are not included, so treat it as a planning estimate.

The schedule lives in your browser, so the usual way to share it is a PDF or a printout. The per-employee layout gives each person a card with only their own shifts.

Their shifts are not deleted. They move to the Open shifts row so you can drag them to someone else.

Scroll to Top